Workflow

The workflow involving enquiry, production, delivery and service is described below. Obviously, the description applies to all our products, with the differences inherent in the production process.

Enquiry

The customer fills in and submits an enquiry form on Mosbaek's website. Or the form is printed, filled out by hand, scanned and submitted.

Alternatively, the customer sends an email containing information or contacts us by telephone.

Once an enquiry has been received by Mosbaek, it is registered in our quotation and ordering system. We draw up an individual, free and non-binding quotation adapted to the data provided. This is done in part by means of our design program and in part based on an evaluation by a specialist. If the conditions are special, this will be taken into account for the preparation of the quotation: a combined solution will be offered. Therefore, please remember to notify us of any special conditions.

After this, we produce a CAD drawing of the flow regulator and a quotation, which we send to the customer.

Order

When a quotation has been accepted and we receive an order, the following occurs: we determine whether any additional information is needed and request this. This could be the inner diameter of a sewer, the preferred direction of the inlet pipe for a CY flow regulator (right-handed/left-handed) or the length of the stick for type CEV, etc. When all information has been received, the order confirmation is prepared in which we confirm the delivery address and invoicing address, as well as the terms and conditions of payment.

Production

The individual flow regulators are designed in AutoCAD; the final drawing is transferred directly to a laser-cutting machine. The laser cutter precisely cuts out the individual components in acid-resistant stainless steel AISI 316L (Werkstoff 1.4404), according to the drawing.

Equipment from external suppliers i.e. penstocks, which are integrated in the solution, can be made in AISI 316 (werkstoff 1.4401)

The components are processed and assembled with TIG welding, after which all welds are efficiently cleansed with a TIG brush.

Control

When the flow regulator is finished, a label with its specifications is applied to it. After this, we verify whether the specifications conform to the regulator and whether it corresponds to the customer's order.

Packing and shipment

The flow regulator is booked for collection by a transport company which usually picks up goods on Friday and delivers them at the beginning of the following week. During the packing procedure, assembly instructions (sketch) and installation bolts (made of acid-resistant stainless steel) are enclosed with the regulator. Our normal delivery time is roughly two weeks. If the order is urgent for the customer, we endeavour to speed up the process wherever possible.

Assembly/installation

Assembly and installation are done by the contractor's authorised sewer contractor who specialises in casting of concrete benching, channels, etc.

Service

Satisfied customers are our best publicity, so needless to say we are available to answer any questions that may arise during installation and subsequent operation. If the flow regulator's capacity needs to be changed later on, we calculate a new orifice setting or supply a new baffle free of charge.

Documentation

Upon receiving an enquiry, Mosbaek draws up a quotation comprising an installation sketch, the quotation itself and a cover letter. If requested, we can prepare flow characteristics. If the quotation is prepared in spite of insufficient information, it will be clear that some values are estimated, which means that the price will also be an estimate. The documents are sent by e-mail.

If an order is placed, the installation sketch is reviewed and any missing information is collected and incorporated into the project and on the sketch. An order confirmation is prepared specifying the final price, terms and conditions of payment, dispatch time, delivery address and invoicing address. These documents are sent by an email containing a cover letter.

In some instances, customers want to receive flow characteristics based on a specific test. Mosbaek has its own testing centre where the vast majority of flow and head combinations can be set up and tested. This service is provided in return for payment and only for flow regulators which have been ordered.

A label documenting the flow regulator's specifications is applied to the flow regulator. An installation sketch is sent together with the flow regulator.

Installation instructions and operation and maintenance guidelines can be downloaded from this website.

All orders, including correspondence, are kept on file indefinitely.

Enquiry

Fill the formular and we will send a non-binding quotation

Write to us here

Cases

Be inspired by cases in which Mosbaek's flow regulators make a difference

See more here

Contact

Write to us and we will get back to you as soon as possible.

Write to us here